Home/Industries/Engineering
Industry · Engineering & Infrastructure

Connect design, field, and program data
into one project intelligence.

Construction and infrastructure programs run on fragmented information: BIM models, field reports, drone scans, RFI threads, schedule data, and lessons-learned PDFs. Verne builds the digital twin and project-intelligence systems that connect them.

Sector Focus
AEC / Infra
Twin Coverage
Live
Field Integ
Mobile-First
Asset Programs
9
Operational Pain Map

What goes wrong on every large program,
regardless of who’s running it.

We’ve embedded inside enough construction and infrastructure programs to recognize the patterns. They are structural, not personal.

BIM disconnect

Designers maintain the model. The field never sees it as built. Coordinators rebuild reality from photos.

RFI sprawl

Thousands of RFIs live in email and spreadsheets. The same question gets asked four times across subs.

Inspection paperwork

Engineers walk the site with paper, transcribe at the desk, re-scan defects. Photos and reports drift apart.

Schedule reality gap

P6 says one thing. The site says another. Reconciliation happens monthly, after problems compound.

Safety incident learning

Near-misses log but never propagate. The same near-miss recurs at three sites in the program.

Asset handover

End-of-program data dumps are PDFs. Operators inherit binders, not living digital twins.

Verne Solution Map

Six systems for design-data,
field activity, and project intelligence.

Each is engineered to work with the BIM, project controls, and field tools you already run, not replace them.

01Twin

Digital Twin Platform

Live BIM-integrated twin with site reality capture, deviation detection, and progress tracking.

02Field

Field Inspection App

Mobile-first inspections with photo, voice, and AR overlay. Defects auto-routed to subs with SLAs.

03Executive

Project Intelligence Cockpit

Schedule vs. reality, RFI velocity, safety leading indicators, cost trajectory, drill-down enabled.

04AI Agent

RFI & Submittal Agent

Triages incoming RFIs, finds prior answers, drafts responses, routes to the right discipline lead.

05XR

AR/VR Safety Training

Immersive training simulations grounded in site-specific hazards. Tracked, evaluated, refreshable.

06Handover

Asset Handover Twin

Programmatic export of as-built data into a live operations twin. Operators get a system, not a binder.

Reference Architecture

A program operating system,
from design to operations.

Top to bottom: stakeholder surfaces, the twin, project intelligence, field and design systems, source data, and operational infrastructure.

L6
Stakeholder Surfaces
Executive, designer, field engineer, sub, operator
L5
Live Digital Twin
BIM + reality capture + IoT + sensors, time-versioned
L4
Project Intelligence
Schedule, cost, safety, quality, RFI agents
L3
Field & Design
Revit, Navisworks, P6, Procore, ACC, mobile capture
L2
Source Systems
Drone, photogrammetry, IoT, weather, scheduling
L1
Cloud & Edge
Field-deployable edge nodes, secure cloud aggregation
Compliance & Considerations

Built for the realities
of multi-stakeholder programs.

Programs run with many primes, subs, designers, owners, and operators. We engineer for shared accountability, not single-party tools.

Multi-Party Permissions

Shared data with party-scoped access. Subs see their scope. Owners see the program. Designers see the model.

Field-Capable Infrastructure

Offline-first mobile, edge-deployable inference. Sites with poor connectivity still capture and sync reliably.

Data Provenance

Every observation is linked to time, location, capturer, and source. As-built is always reconstructable.

Standards Alignment

IFC, COBie, BCF, ISO 19650. We interoperate with what your designers and operators already use.

AI Systems Readiness Audit

Bring us your
most complex workflow.

In 7–10 working days, Verne maps your workflows, data sources, repetitive decisions, automation opportunities, and AI risk areas. You receive a prioritized roadmap showing what to automate, integrate, avoid, and build first.

Tell us what is broken. We will map the system.